2013 Pilot Awardees
Just‐in‐Time Pilots Utilizing Core Technologies
PI | Dept. | Project | Amount Funded | Award Dates |
---|---|---|---|---|
Barbara Ehrlich | Pharmacology | Structural Interactions of Chemotherapeutic Agents | $ 7,000.00 | 7/01/13- 6/30/14 |
Donald Engelman | Molecular Biophysics and Biochemistry | Monitoring the Efficacy of Exercise in Recovery from Peripheral Artery Disease Using a Novel Imaging Probe | $ 6,826.00 | 7/01/13- 6/30/14 |
Michelle Hampson | Diagnostic Radiology | Neurofeedback for Obsessive Compulsive Disorder | $ 6,900.00 | 4/01/13- 3/31/14 |
Mark Horowitz | Orthopaedics | Analysis of Adipogenesis in Human Lipomas and Liposarcomas | $ 3,696.00 | 6/01/13- 5/31/14 |
Ifat Levy | Neurobiology | Neural Correlated of Reward Learning in Obesity | $ 6,900.00 | 7/01/13- 6/30/14 |
Deepak Narayan | Surgery- Plastic Surgery | Characterization of the Effect of PTH on Adipokine Secretion | $ 7,000.00 | 4/15/13- 4/14/14 |
Kevin O’Connor | Neurology | Mechanisms of Autoantibody Production in Myasthenia Gravis | $ 6,378.00 | 7/01/13- 6/30/14 |
Abhijit Patel | Therapeutic Radiology | Tumor DNA in Blood as a Biomarker for Early Detection and Monitoring of Lung Cancer | $ 7,000.00 | 7/01/13- 6/30/14 |
Godfrey Pearlson | Neurobiology | Assessment of the Relationship Between Hormone Levels and Bariatric Surgery Outcome | $ 6,984.80 | 7/01/13- 12/31/14 |
David Pitt | Neurology | Retrieval and Charterization of Multiple Sclerosis Tissue from the Yale Pathology Tissue Archive | $ 7,000.00 | 6/01/13- 5/31/14 |
Christopher Pittenger | Psychiatry | An Optimized Protocol for Multi‐Modal Imaging in Obsessive‐Compulsive Disorder Using the Human Connectome Project | $ 6,900.00 | 7/01/13- 6/30/14 |
Nicola Santoro | Pediatrics- Endocrine | Role of Common Variants in the 5’ And 3’ UTRs of Candidate Genes in the Pathogenesis of Pediatric NAFLD | $ 6,900.00 | 7/01/13- 6/30/14 |
Tactical Clinical and Translational Science Pilot Award
PI | Dept. | Project | Amount Funded | Award Dates |
---|---|---|---|---|
Barbara Ehrlich | Pharmacology | Prevention of Chemotherapy‐Induced Peripheral Neuropathy | $ 14,000.00 | 7/15/13- 7/14/14 |