Shutdowns

During construction the Constructor will be required to shutdown certain utilities as connections to existing services are made. Most of these shutdowns will be local and only affect the area under construction. Some shutdowns will impact a larger area. All shutdowns will be part of the Two Week Look Ahead so that affected users will be notified prior to the shutdown and can prepare accordingly (see Notifications). In addition, notices will be posted in all the affected areas prior to the shutdown.