Yale School of Medicine
  • Education
  • Patient Care
  • Research
  • Faculty
  • News
  • Library
  • A-Z Index
  • Search
Facilities Planning & Construction
  • Home
  • Project Management
  • Process
  • Projects
  • Performance
  • Procedure Manuals
  • Sustainability
  • FAQs
    • Find a Physician
    • Calendar
    • Contact Us
    • Maps & Directions
    • Yale Phonebook
    • YSM Home
    YSM Facilities Construction & Renovation
    100 Church Street South
    Suite 214
    New Haven, CT 06519
    Tel: 203.737.2841
    Fax: 203.737.2848
  • Print

Procedure Manuals

The following are the required procedure manuals to follow for work at the Yale School of Medicine.

Design Standards

  • Section I. Administrative
  • Section II. Divisions 1 - 14
  • Section III. Division 15 Plumbing
  • Section IV. Division 15 Fire Protection
  • Section V. Division 15 HVAC
  • Section VI. Division 16 Electrical
  • Section VII. Materials & Installation Policies
  • Section VIII. Required Typical/Details

Designer’s Guide

  • I. Organizational Issues
  • II. Design Phase
  • III. Construction Phase Procedures
  • IV. Close Out Procedures
  • V. Miscellaneous Issues
  • HVAC System Basis of Design

Constructor’s Guide

  • I. Organizational Issues
  • II. Pre-Construction Phase Issues
  • III. Construction Phase Procedures
  • IV. Close Out Procedures
  • V. Miscellaneous Issues rev 3/3/2008

© Yale School of Medicine Yale School of Medicine

  • Yale School of Medicine
  • Contact Us
  • Intranet
  • Privacy policy
  • Site editor
  • Updated 11/04/11